Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

Critical Pathways to School Readiness: Implications for First 5 Ventura County Strategic Planning, Funding and Evaluation

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Availability:
      UCLA Center for Healthier Children, Families and Communities. 1100 Glendon Avenue Suite 860, Los Angeles, CA 90024. Tel: 310-794-2583; Fax: 310-794-2728; e-mail: chcfc@ucla.edu; Web site: http://www.healthychild.ucla.edu
    • Peer Reviewed:
      N
    • Source:
      248
    • Education Level:
      Early Childhood Education
      Preschool Education
    • Subject Terms:
    • Subject Terms:
    • Abstract:
      The UCLA Center for Healthier Children, Families and Communities (CHCFC) has developed the School Readiness Critical Pathways (SRCPs) as an evidence-based conceptual model that links related outcomes and strategies. This helps to organize an array of broad and diffuse evidence regarding the strategies that produce school readiness outcomes for young children, families and communities in order to communicate the First 5 Ventura County "story." It also provides a blueprint for systematically developing a set of recommendations that are designed to help inform the First 5 Ventura County Commission's strategic planning, funding and evaluation efforts. There are six sections to this report: Section I describes how the SRCPs were developed and how to interpret and communicate the basic SRCPs diagram. Section II presents a gaps analysis that compares the SRCPs to First 5 Ventura County's strategic plan in order to make recommendations about how future iterations of the plan can be increasingly aligned with the evidence base. Section III conducts a second gaps analysis that compares the SRCPs to the strategies funded by the Commission in fiscal year 2004-2005 in order to make recommendations about future funding priorities. Section IV draws on the outcomes identified in the critical pathways to prioritize a set of countywide indicators and programmatic performance measures that will be used to assess the contribution of First 5 Ventura County in achieving school readiness outcomes for young children, families, and communities. Section V summarizes the recommendations that are detailed in sections II-IV. Section VI concludes with suggestions on future refinement and uses of the critical pathways. The following are appended: (1) School Readiness Critical Pathways; (2) A Literature Review to Inform the Development of School Readiness Critical Pathways; and (3) Standardized Outcome Performance Measures. (Contains 1 table and 2 figures. Appendix B contains references for literature review.) [This project was made possible through funding and support from the Center for Excellence in Early Childhood Development and First 5 Ventura County.]
    • Abstract:
      ERIC
    • Number of References:
      9
    • Publication Date:
      2007
    • Accession Number:
      ED496805