Integration of additional purchase cost to reduce the lead time uncertainty for one level assembly system

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • Contributors:
      Laboratoire d'Optimisation des Systèmes Industriels (LOSI); Institut Charles Delaunay (ICD); Université de Technologie de Troyes (UTT)-Centre National de la Recherche Scientifique (CNRS)-Université de Technologie de Troyes (UTT)-Centre National de la Recherche Scientifique (CNRS); Laboratoire en Sciences et Technologies de l'Information; Laboratoire d'Informatique, de Modélisation et d'optimisation des Systèmes (LIMOS); Université Blaise Pascal - Clermont-Ferrand 2 (UBP)-Université d'Auvergne - Clermont-Ferrand I (UdA)-SIGMA Clermont (SIGMA Clermont)-Ecole Nationale Supérieure des Mines de St Etienne (ENSM ST-ETIENNE)-Centre National de la Recherche Scientifique (CNRS)-Université Blaise Pascal - Clermont-Ferrand 2 (UBP)-Université d'Auvergne - Clermont-Ferrand I (UdA)-SIGMA Clermont (SIGMA Clermont)-Ecole Nationale Supérieure des Mines de St Etienne (ENSM ST-ETIENNE)-Centre National de la Recherche Scientifique (CNRS)-Département Décision en Entreprise : Modélisation, Optimisation (DEMO-ENSMSE); École des Mines de Saint-Étienne (Mines Saint-Étienne MSE); Institut Mines-Télécom Paris (IMT)-Institut Mines-Télécom Paris (IMT)-Institut Henri Fayol-École des Mines de Saint-Étienne (Mines Saint-Étienne MSE); Institut Mines-Télécom Paris (IMT)-Institut Mines-Télécom Paris (IMT)-Institut Henri Fayol; N. Bakhtadze; A. Dolgui; V. Lototsky
    • Publication Information:
      HAL CCSD
      Elsevier Science, IFACPapersOnline.net
    • Publication Date:
      2013
    • Collection:
      Mines de Saint-Etienne: Archives Ouvertes / Open Archive (HAL)
    • Subject Terms:
    • Abstract:
      International audience ; We consider the supply planning for one level assembly system under uncertainty of lead times. The finished product need several components for the assembly operation. The lead times can be uncertain for different reasons such as machine breakdowns, transport delay, strike, etc. In literature, this type of problem was studied in the case of random lead times that follow continuous distributions as well as in the case of any discrete laws with known distribution. We consider the case of discrete distributions to be closer to the industrial reality because often in real life situations the lead time is expressed as the number of periods. Typically, this is an inventory control problem where the objective is to minimize the component holding and backlog costs for the finished product due to the uncertainty of lead times. Indeed, as the finished product is assembled by using several types of components, the assembly is stopped even if a single type of component is delayed. The other components are stored between their arrival and the arrival of the latest component. To reduce stock and backlog costs, we propose to pay the supplier more, if he/she agrees to decrease his lead time uncertainty. A model describing this choice is suggested.
    • Relation:
      emse-00881563; https://hal-emse.ccsd.cnrs.fr/emse-00881563; https://hal-emse.ccsd.cnrs.fr/emse-00881563/document; https://hal-emse.ccsd.cnrs.fr/emse-00881563/file/hnaien2013.pdf
    • Accession Number:
      10.3182/20130619-3-RU-3018.00561
    • Online Access:
      https://doi.org/10.3182/20130619-3-RU-3018.00561
      https://hal-emse.ccsd.cnrs.fr/emse-00881563
      https://hal-emse.ccsd.cnrs.fr/emse-00881563/document
      https://hal-emse.ccsd.cnrs.fr/emse-00881563/file/hnaien2013.pdf
    • Rights:
      info:eu-repo/semantics/OpenAccess
    • Accession Number:
      edsbas.52F78EBA