Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request
Academic Journal

IMPLEMENTASI METODE FMEA & FTA UNTUK MEMPREDIKSI DELIVERY TIMEPROJECT EPC – STUDI KASUS KONSTRUKSI/ FABRIKASI POWER GENERATION MODULES 2X62MW FPSO X PROJECT PT. X DI BATAM

Subjects: Proyek; Manufaktur/Fabrikasi; FMEA

  • Source: Teknobiz : Jurnal Ilmiah Program Studi Magister Teknik Mesin; Vol 7 No 3 (2017): Teknobiz; 129-136 ; 2088-5784 ; 10.35814/teknobiz.v7i3

Record details

×
Academic Journal

USULAN PENURUNAN TINGKAT KECELAKAAN KERJA DENGAN MENERAPKAN METODE FMEA DAN FTA PADA PT. JAGAT INTERINDO

Subjects: Failure Mode And Effect Analysis; Fault Tree Analysis; Kecelakaan Kerja

  • Source: Jurnal Rekayasa dan Optimasi Sistem Industri; Vol 3 No 1 (2021): Jurnal Rekayasa & Optimasi Sistem Industri; 20-24 ; 2798-7051

Record details

×
Academic Journal

ANALISIS OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI MENGGUNAKAN METODE TIME COST TRADE OFF

Subjects: optimasi biaya dan waktu; Time Cost Trade Off; faktor keterlambatan

  • Source: Jurnal ARTESIS; Vol 4 No 1 (2024): JURNAL ARTESIS; 92-101 ; 2809-4441 ; 2809-6231 ; 10.35814/artesis.v4i1

Record details

×
  • 1-4 of  4 results for ""FTA""